What changes for extensions under the March 2027 building regulations?

In short. On 24 March 2027 new editions of the building regulations guidance for energy and ventilation come into force in England. For a house extension, the insulation standards and the limit on glazing stay exactly as they are. What changes is how the heating is sized, with a room by room heat loss calculation whenever new heating goes in, and how extract fans are ducted. Work that building control is notified of before 24 March 2027 can follow the current rules, provided it starts on site before 24 March 2028.
From our projects. Every extension we take through building regulations gets a written specification of how it is built, from the insulation in each wall to the way the heating and the extract fans are sized. We are updating ours for the 2026 editions now. Having been through both documents against the versions they replace, for an extension most of it stays the same. The changes are in the heating and the ventilation ducts, and both are easiest to get right while the extension is still being designed. At Drakefield House in Tooting we rebuilt the ground floor as a concrete deck to carry underfloor heating, which is the kind of decision that belongs on the drawings, long before anyone is on site.

What changes on 24 March 2027?
Two of the government's Approved Documents are reissued. These are the official guidance on how to meet the building regulations, and they are what building control checks your work against. Approved Document L covers energy use and Approved Document F covers ventilation. Both 2026 editions take effect on 24 March 2027 for most building work in England, under amending regulations laid in March 2026 (S.I. 2026/335).
The biggest changes are for new homes, under what the government calls the Future Homes Standard. It brings in a tougher energy target for new dwellings and a new requirement for them to generate renewable electricity on site, which in practice usually means solar panels. Extensions and alterations to an existing house are covered by the same two documents, but see much smaller changes. Wales has its own editions, which take effect on 4 March 2027, so this article is about England.
Will my extension need more insulation?
No. The limiting U-values for new walls, roofs, floors, windows and doors in an existing house are the same in the 2026 edition as in 2021. A U-value measures how much heat passes through a part of the building, so the lower the figure, the better it insulates.
The maximum U-values, in W/m²K, are:
Roof: 0.15
Wall: 0.18
Floor: 0.18
Window: 1.4, or Window Energy Rating band B
Rooflight: 2.2
Mostly glazed door: 1.4, or Doorset Energy Rating band C
The limit on glazing is also unchanged. The total area of windows, rooflights and doors in an extension should not exceed 25 per cent of the extension's floor area, plus the area of any windows and doors that the extension covers up. If you want more glass than that, the 2026 edition now sets out three ways of showing compliance side by side, which are the standard values above, an area-weighted calculation, or a full energy calculation using the government's Standard Assessment Procedure. On insulation and glazing, a design drawn to today's standards will not be out of date in March.
What changes for the heating?
This is where most of the change is. The 2021 edition already asked for a heat loss calculation and said a heating system should not be significantly oversized. The 2026 edition names the method, which is the heat loss calculation in BS EN 12831-1, the standard way of working out how much heat each part of a building loses, and says systems should not be oversized. When new heating goes in, whether that is a new boiler or heat pump, new radiators or underfloor heating, or both, the calculation should be done room by room. When only the boiler is being replaced, one calculation for the house as a whole is enough, and the document now says in terms that sizing the new boiler from the output of the old one is not appropriate.
One other point is new. An air source heat pump should be inverter driven, which means it can vary its output instead of switching on and off, and it should be chosen so it can turn down to the house's typical heating load in spring and autumn.
Two rules carry over from 2021. A gas combination boiler should still be chosen so it can turn down to the house's typical heating load, rather than running in short bursts. A new or fully replaced wet heating system should still be designed to heat the house with water at no more than 55°C, which usually means larger radiators or underfloor heating. Where that is not practical, the system is designed for the lowest temperature that will still do the job.
For an extension, the practical point is that whoever designs the heating will need the size of each room and the insulation build-ups, and those come from the drawings. If you are adding underfloor heating or new radiators as part of the work, it pays to have the heating designed alongside the extension, so the floor build-up, the pipe routes and the plant space are settled before the builder prices it. That is part of the technical design stage in how a project runs with us.
What changes for ventilation?
The amount of ventilation an extension needs is unchanged. A new habitable room still needs background ventilators, such as trickle vents, and a new kitchen, utility room, bathroom or WC still needs extract ventilation to the outside.
What is new is how extract fans are installed. The 2026 edition asks for rigid ducting on an intermittent extract fan, with the duct no longer than 2 metres where practical. Longer runs need design calculations and drawings sent to building control to show the fan can still move enough air. Flexible duct is limited to 200mm, for the final connection to the fan only. The person commissioning a single extract fan in an existing house should now have had appropriate training. As before, a commissioning notice goes to building control once the fan is in.
In practice, this makes the position of the fans a design decision. A bathroom or utility room against an outside wall is simple. A shower room in the middle of the plan, or a kitchen fan that has to cross a ceiling to reach the back wall, needs the duct route worked out on the drawings, together with the structure it passes through.
Can I still build to the current rules?
Yes, if you notify building control in time. The new rules do not apply where a building notice, an initial notice or a full plans application is given before 24 March 2027, provided the work starts before 24 March 2028. A building notice and a full plans application go to the council's building control. An initial notice is the equivalent when you use a registered building control approver instead. "Starts" has a specific legal meaning here, so it is worth confirming with your building control body what counts on your job. The protection applies building by building, so on a site with several houses, only the ones that have started keep it.
For most extensions, the difference between the two sets of rules is small enough that we would not rush a design to beat the date. Where the work includes a new heating system, it can make sense to give notice before 24 March, so the scheme you have designed is checked against the rules it was drawn to.
What else changes around the same time?
The 0% VAT on insulation, heat pumps, solar panels and batteries installed in homes ends on 31 March 2027, and the rate goes back to 5% from 1 April 2027. The rest of the building work on an extension carries VAT at the standard 20%, so a budget should always show build costs including VAT. If you are planning a heat pump or extra insulation as part of an extension, the timing of that part of the work is worth discussing with your builder.
Questions we are often asked
Does the Future Homes Standard apply to my extension? Not in the way it applies to a new house. The Future Homes Standard is the name for the new rules for newly built homes. An extension to an existing house follows the same 2026 guidance, but only the parts written for existing homes, which are the ones set out above.
Do I need solar panels on my extension? No. The new requirement for on-site renewable electricity applies to new homes, not to extensions of existing ones.
Do I need to fit a heat pump? No. The sizing rules apply to whatever heating system you choose, whether that is a boiler, a heat pump or something else.
Does this apply in Wales? Wales has its own 2026 editions, which take effect on 4 March 2027, with a cut-off of 3 March 2028 for work that has been notified in time.
If you are planning an extension for next year and want to know what these changes mean for your own house, book a free 30-minute call with us.
Sources
Approved Document L, Volume 1: Dwellings, 2026 edition, as updated September 2026 (paragraphs 3.8, 4.9 to 4.14, 10.7 to 10.10, Table 3.2), GOV.UK
Approved Document F, Volume 1: Dwellings, 2026 edition, as updated September 2026 (paragraphs 1.76 to 1.80, 3.17 to 3.29, 4.10), GOV.UK
Housing, Communities and Local Government Circular 01/2026, 24 March 2026, GOV.UK